No photo yet
Asset Optimization Services Implementation (for operation) On the basis of the results from the concept phase 9LA1110-8AE10-2AA0 and an individual ...
- Manufacturer part no.
Price on requestAsk us for a quote for this product.
Ordering
- Order unit
- piece
Description
Asset Optimization Services Implementation (for operation) On the basis of the results from the concept phase 9LA1110-8AE10-2AA0 and an individual offer optimization measures are implemented within a defined period. Objective: Creation of the basis for the Asset Optimization Services Operation
Technical data
ETIM class: Accessories/spare parts for controls (EC002584)
Model/type
- Type of electrical accessory/spare part
- UN
- Type of mechanical accessory/spare part
- UN
- Accessory
- UN
- Spare part
- UN
Logistics
- Country of origin
- Netherlands
Packaging
| Pack | Quantity | GTIN | Gross weight | Dimensions (L × W × D) |
|---|---|---|---|---|
| packet | 1 | — | — | — |